We mobilize to your site and review the scope of work with you. The workmen are careful to protect the surroundings and clean up as work proceeds. The installation of the piles is documented and variances are discussed immediately with the engineer of record, as needed. At the end of the project, we review the site conditions with you to ensure the site is being left as planned.
If needed, we also offer full-service cosmetic repairs to our clientele.
http://www.ramateconstruction.comThe installation logs are recorded for each pile and reviewed by the engineer of record. These logs track the total depth achieved of the piles and pressures encountered during installation. The logs are submitted to the local building department along with a Certificate of Completion from the engineer to certify that our installation was in compliance with the plan. The installation ends at this point, the permit is finalized and you can rest assured that you have a strong foundation which you can rely on and give you peace of mind for many years.